When do I need a permit from the Health Department?

Vacant Properties: a well and/or septic permit is needed for any property that you wish to build on that does not have City water and/or sewer utility connections 

Additions (commercial & residential): if property has a septic tank on-site then you must perform septic verification with the Gaston County Health Department

Remodels (residential): if increasing the bedroom count of the home as part of the remodel then you must perform septic verification with the Gaston County Health Department

Accessory Structures (including pools): if property has a septic tank on-site then you must perform septic verification with the Gaston County Health Department

For commercial establishments, both new and existing,  you must contact the Gaston County Health Department for an understanding if a permit is needed from their office. Examples of commercial establishments that would require a permit from the Health Department are as follows: food establishments, nursing homes, commercial swimming pools, etc.

The Gaston County Health Department can be contacted at 704-853-5200. 

A copy of the Health Department permit, if applicable, is needed when applying for the building permit.

Show All Answers

1. Do I need an architect to draw my plans?
2. If I make changes on my approved plans, do I need to bring them back to plan review?
3. Who do I contact about asbestos or lead paint?
4. Who do I talk to about site grading, soil erosion, water quality, wetlands, stream run-off, etc.?
5. What do I need to get a Building Permit for a new single family dwelling, multi-family dwelling or mobile home?
6. When is a Licensed Contractor required?
7. When is a permit required for a residential accessory/storage building? If a permit is required what all documentation is needed to submit for the building permit?
8. When is a remodeling permit required?
9. Are there any restrictions to the number, size or location of buildings I can place on my property?
10. How do I apply for an Agricultural Exemption?
11. What Building Code(s) is enforced in Gaston County?
12. What's the difference between a modular home and a mobile home?
13. When do I need a permit from the Health Department?
14. What is the status of my permit request?
15. How do I request and/or cancel an inspection?
16. Where can I find information surrounding permit fees?
17. When will I be able to receive power during construction?