When do I need a permit from the Health Department?

Any time you're building on a lot that does not have city water and sewer. If you are remodeling or adding to an existing structure where the proposed work extends outside of the existing footprint (outline) of the building, or you are adding bedrooms to a residence, swimming pool, or work at a food establishment then you will need a permit from Environmental Health.

Show All Answers

1. What do I need to get a Building Permit? What size plans do I have to submit? Do I need an architect or engineer?
2. When is a Licensed Contractor required?
3. Do I need an architect to draw my plans?
4. Do I need a permit for a residential storage building?
5. When is a remodeling permit required?
6. How big of a building can I put on this lot? How much of my lot can I cover with buildings? What type of business is allowed on this property? How close to my lot line can I build?
7. Can I get a Farm Exemption?
8. Does Gaston County have Code books for sale?
9. If I make changes on my approved plans, do I need to bring them back to plan review?
10. What's the difference between a modular home and a mobile home?
11. When do I need a permit from the Health Department?
12. What is the status of my plan I submitted?
13. I was turned down on my inspection, who can I talk to about it?
14. What's my building permit going to cost?
15. Who do I contact about asbestos or lead paint?
16. Who do I talk to about site grading, soil erosion, water quality, wetlands, stream run-off, etc.?
17. What are helpful hints for permitting electronically with Gaston County?